access control distributor you need to call. [/spin] For 26 years, Encon has offered thousands of gate operator, commercial door operator and access control products from 60 manufacturers . Encon also provides the most expert technical representatives in the access control industry. [/spin]
automated gate operator is only the first step . Maintaining and troubleshooting the system are equally critical . Customers are content when the installation is complete and performing correctly , but what happens when the system crashes ? End users assume the malfunction to be solved immediately . If you use proper equipment and correct installation techniques , you will be able to identify and solve most problems quickly. [/spin]
instrument should be required when going to troubleshoot a site . A high standard meter measures both AC and DC, minimum and maximum voltage, ohms and continuity, capacitance and AC/DC amperage draw. Expect to pay approximately $150 for a meter with all of these necessary features .
Power related issues commonly cause gate operator problems . Most gate operators have both a primary (high) and secondary (low) voltage. The primary is generally used to power the electric motor and the secondary voltage is most commonly used for accessories . Ordinarily the incoming voltage is 115VAC and the secondary or outgoing voltage is 24VAC or VDC. However, more and more gate operators are being designed as low voltage. these type of operators have an incoming and secondary voltage of 12/24 AC/DC. These voltages are crucial. A quality digital meter [spin] will display these voltages to a decimal point.| A high end multi-meter can provide the voltage amount to a decimal point.[/spin]
The first step when troubleshooting an operator is [spin} determining | deciphering | testing | accessing [/spin] whether its a high or low voltage problem. If power is missing , test the on/off switch. Do not measure the voltage with the gate operator off. A proper voltage check can be assessed while the operator is under load while the gate operator is on . Next Place the meter to its Min/Max setting. transpire during the cycle. [/spin] If there is a significant voltage dip before continuing.
When testing for secondary power, first ensure the meter is set properly. Some gate openers use a 12/24 VAC secondary while others use 12/24 VDC. If the gate opener is VDC, observe polarity. The positive terminal is posted on the red meter leg and the negative is on the black meter leg. . If there is no voltage , check the fuse(s).